Multi-Temperature Facility

Posted by Jason Tindley on 02-Apr-2024 16:22:15

LPC-Multi-Temperature-Facility

LPC were engaged by an overseas client who distribute quality global  branded foods to determine the optimum materials handling system for a new multi-temperature facility. The project covered warehouse processes from receipt through putaway to picking, assembly, packing and despatch, optimum sizing of chambers, storage layout and appropriate fork truck specifications.

Alternative storage concepts were developed ranging from conventional wide aisle and narrow aisle racking and shuttle racking with budget costs provided with the agreed solution supported with technical specifications for tendering purposes.

Additional support was provided to enable the optimum loading dock solution for a mix of commercial vehicles and ancillary logistics related equipment.

WD-Atchison-Topeka dfvfds

The project concluded with LPC snagging and commissioning the installation for handover to the client.

New Call-to-action

Topics: Warehouse Design

Subscribe here!

Recent Posts

New Call-to-action